On sale in Malaysia · battery electric vehicle
Chery OMODA E5 price and specifications in Malaysia
As of 26 August 2026, Chery Malaysia's Peninsular Malaysia price list sets the OMODA E5 private-individual price at RM146,978 on the road without insurance. The official promotion page lists lower YOM2025 and YOM2026 prices for a limited time and limited stock.

Information checked 26 August 2026
- The permanent table uses the RM146,978 official price effective from 1 January 2026.
- The official promotion page showed YOM2025 at RM99,800 and YOM2026 at RM108,800 on 26 August 2026, subject to limited time, stock and terms.
- The 430 km figure is the official WLTP range; actual range changes with speed, weather, traffic, load and air-conditioning use.
What does the Chery OMODA E5 cost in Malaysia?
The OMODA E5 monthly guide uses the RM146,978 permanent reference price, 10% down payment, a 9-year hire-purchase term and 2.9% flat annual interest. A limited-stock promotional unit produces a different amount.
| Variant | Price | Monthly guide | Battery | WLTP range |
|---|---|---|---|---|
| OMODA E5 | RM146,978 | RM1,544/month* | 61 kWh LFP | 430 km WLTP |
Final instalments depend on bank approval, approved rate and financing terms. Prices and specifications can change after the stated check date.
What are the official Chery OMODA E5 specifications?
| Item | Official Malaysia specification |
|---|---|
| Motor output | 150 kW and 340 Nm |
| Battery | 61 kWh lithium iron phosphate |
| Official range | 430 km WLTP |
| Official energy use | 15.5 kWh/100 km |
| DC charging | 80 kW maximum; 30-80% in 28 minutes |
| AC charging | 9.9 kW maximum |
| Vehicle-to-load | 3.3 kW |
| Acceleration | 0-100 km/h in 7.2 seconds |
| Top speed | 172 km/h |
How far can the Chery OMODA E5 drive?
Chery Malaysia lists 430 km WLTP for the OMODA E5's 61 kWh LFP battery. WLTP is a laboratory cycle, not a guaranteed trip distance. Higher speed, hot weather, heavy traffic, vehicle load, tyre pressure and air-conditioning use can reduce real driving range.
How quickly can the Chery OMODA E5 charge?
The OMODA E5 supports up to 80 kW DC charging, with an official 30-80% time of 28 minutes. It also supports up to 9.9 kW AC charging and 3.3 kW vehicle-to-load output. Actual charging time depends on battery temperature, starting charge and charger output.
Can I test drive the Chery OMODA E5 in Kluang?
Li Koon Auto accepts OMODA E5 test-drive requests for Chery Kluang. The branch confirms the vehicle, appointment time and availability before the customer travels.
Frequently asked questions about the Chery OMODA E5
What is the OMODA E5 price in Malaysia?
Chery Malaysia's price list effective 1 January 2026 states RM146,978 for a private individual in Peninsular Malaysia, on the road without insurance. Limited-stock promotional prices must be confirmed separately.
What is the OMODA E5 monthly payment?
Li Koon Auto's guide is RM1,544 per month using the RM146,978 reference price, 10% down payment, 9 years and 2.9% flat annual interest. Final financing depends on bank approval.
What is the OMODA E5 battery range?
The OMODA E5 has a 61 kWh LFP battery and an official range of 430 km WLTP. Real range varies by driving and charging conditions.
Official sources
Li Koon Auto checked the product facts below on 26 August 2026. Local display, colour and test-drive availability still require branch confirmation.